One contract.
Steel to finish.
Nunteknik is an Istanbul-based main contractor that started in structural steel. We deliver industrial plants and steel-heavy buildings from the steel frame to handover under a single contract. Coordination between steel, civil works and building services stays with us.
Why One Contract
Three things that reduce delivery risk on complex industrial projects.
One contract, one party
You sign one contract. Steel, civil works, building services and finishes are ours to coordinate, and so are the gaps between them.
We started in steel
For more than 30 years we have erected, strengthened and dismantled structural steel, on the Bosphorus, Fatih Sultan Mehmet and 1915 Çanakkale bridges among others. On a steel-heavy building we detail the frame, manage its fabrication and erect it.
What we do not do ourselves
Fabrication runs in EN 1090 certified partner shops. Civil, MEP and finishing trades are subcontractors we manage, inspected against our own ITP and inspection forms.
Selected Projects
A selection of recent delivery on Türkiye's most demanding steel scopes.
DeliveredVertical Bright Annealing Line (VBAL) Building and Towers, Çorlu
Nunteknik strengthened a steel building at an operating metals plant in Çorlu, raised its crane runway to level +42.00 m and built a main tower housing the three towers of a vertical bright annealing line (VBAL), around 1,093 tonnes of steel including additional works.
Deliveredİkitelli Business Centre Shell and Core Works
Nunteknik delivered the excavation, bored-pile shoring, reinforced-concrete basement, a structural steel frame of around 412 tonnes, roof and façade of a business centre with 8,093 m² of gross floor area in İkitelli, Istanbul, as main contractor under a single contract.
Delivered1915 Çanakkale Bridge Anchor Block and Pier Access Structures
Nunteknik delivered, as one package from shop drawings to erection, around 112 tonnes of galvanised steel access structures for the anchor blocks, viaduct piers and side-span piers of the 1915 Çanakkale Bridge.
Where we deliver
End-to-end delivery under a single contract on complex steel projects.
Bridge & Infrastructure
Rehabilitation, erection and specialist systems on landmark bridge and infrastructure projects.
Industrial Facilities
Single-point delivery from steel structure to final handover on production and logistics facilities.
Commercial & Institutional
Single-contract coordination on steel-intensive commercial and institutional builds.
Steel work on four major bridges: repairs on bridges in service, new-build work on 1915 Çanakkale.
Execution Method
From engineering to handover, every stage stays under one contract. We inspect each stage against our ITP, and independent third-party inspection is added where the contract calls for it.
Fabrication standards
Fabrication runs in certified partner shops. The documentary proof that demanding industrial and defense-adjacent buyers require.
Structural Steel Execution
Held by the shops we fabricate in. Execution class up to EXC3, set per project.
Our References
Clients and main contractors we have delivered for. Where a project is published, the name links to it.
Notes from the work
Bridge Expansion Joint Replacement Under Live Traffic
Replacing an expansion joint on a bridge open to traffic is more than swapping the joint. The method depends on which lanes can be closed, which parts of the deck must be removed, the lifting conditions and the temperature at installation. We develop the method around these constraints, plan the lifts and hand over the installation with its records.
What a Method Statement Reviewer Asks — and How to Answer First
A method statement is rarely sent back for what it says; it is sent back for what it leaves out. Review forms from two bridge jobs show the same gaps: lifting points not checked on site, a sequence not tied to access, no fallback for a seized bolt, and no landing place for each piece.
Let's Discuss Your Project
Send us the drawings and the programme. We will set out how we would build it under one contract.